Description
This book is an effort by Jason Schroeder and the entire LeanTakt team to combine decades of industry experience into a book that is mostly visual. We have only added words where we felt it was absolutely necessary. Countless hours have gone into creating graphics and attempting to explain difficult concepts with simple explanations and visuals. It is our hope that this book will enable the industry to see the Takt Production System® for what it is--the central theme of all lean thinking in construction. This first book is our first pass at delivering a work that can show the Takt system in a macro perspective. We hope that practitioners, software developers, users, owners, contractors, and trade partners will be able to rally around this system which is designed to bring respect back to construction, stability to sites, and flow to our work.
ASIN: B0CKSSMTJ1
VSKU: BVV.B0CKSSMTJ1.A
Condition: Acceptable
Author/Artist:Schroeder, Katie Michelle|Schroeder, Jason William|Schroeder, Katie Michelle|Rice, Kevin David
Binding: Paperback
Note: Any images shown are stock photographs and product may differ from what is shown.
Condition Notes: The item is very worn but is perfectly usable. Signs of wear can include aesthetic issues such as scratches, dents, worn and creased covers, folded page corners and minor liquid stains. All pages and the cover are intact, but the dust cover may be missing. Pages may include moderate to heavy amount of notes and highlighting, but the text is not obscured or unreadable. Page edges may have foxing age related spots and browning . May NOT include discs, access code or other supplemental materials.
ASIN: B0CKSSMTJ1
VSKU: BVV.B0CKSSMTJ1.A
Condition: Acceptable
Author/Artist:Schroeder, Katie Michelle|Schroeder, Jason William|Schroeder, Katie Michelle|Rice, Kevin David
Binding: Paperback
Note: Any images shown are stock photographs and product may differ from what is shown.
Condition Notes: The item is very worn but is perfectly usable. Signs of wear can include aesthetic issues such as scratches, dents, worn and creased covers, folded page corners and minor liquid stains. All pages and the cover are intact, but the dust cover may be missing. Pages may include moderate to heavy amount of notes and highlighting, but the text is not obscured or unreadable. Page edges may have foxing age related spots and browning . May NOT include discs, access code or other supplemental materials.

